article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. kmĀ² platform.

Airports 203
article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. Problem Areas Effect on foundation Defects in structure Insufficient depth of foundation (mostly in soft clayey soil) Movement of foundation due to changes in water table seasonally, and movement due to trees and vegetation.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Rubble Stone Soling: The rubble stone generally used are of best variety of black trap / granite / basalt or other variety of stone available locally. The stone should be hard, durable free from defects and of required size as required at site or as per specification. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) 2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3)

article thumbnail

Achieving project success through product and material testing

Construction Specifier

The construction industry faces a myriad of challenges, such as completing projects on schedule, ensuring the quality and safety of products and materials, overseeing the costs so they do not exceed the budget, and complying with corporate environmental and social responsibility standards; all while applying effective risk management at every step.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. It is kept in the mind that during the execution of the project, it is required to keep the process monitored for timely completion of the project, as per schedules.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close All rights reserved.

America 203