Remove Architecture Remove Fabrication Remove Lien Remove Negotiation
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Projects may be architectural (finishes) , electrical, mechanical and/or plumbing in nature. The architectural scope includes, but is not limited to, demolition and construction of building exteriors and interiors and may include suspended ceilings, gypsum and masonry walls, metal frames and solid core doors, and resilient flooring.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 61 16 Lien Bond Form.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 61 16 Lien Bond Form.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). The terms are negotiated specific to each firm’s individual needs and situation with a maximum limit of 3% of Capital Expenditures. High Impact Performance Incentive: A negotiated grant used to attract and grow major high impact facilities in Florida.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. The SBA takes a second lien on assets and finances up to 40 percent of the project cost, up to $1 million in some cases.

Income 75
article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Demonstrate knowledge and ability to repair all HVAC Systems (calibrate, change, fabricate, recover, replace and trouble shoot as required…). Demonstrate the ability to work with Facilities team to negotiate rates and discounts. Demonstrate knowledge and understanding of Architectural and Engineering Systems:o Roofing Systems.