Remove Architecture Remove Fabrication Remove Lien Remove Subcontracting
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Projects may be architectural (finishes) , electrical, mechanical and/or plumbing in nature. The architectural scope includes, but is not limited to, demolition and construction of building exteriors and interiors and may include suspended ceilings, gypsum and masonry walls, metal frames and solid core doors, and resilient flooring.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). 500 TAX CREDIT: Businesses may earn a $500 tax credit for adding new jobs in the production, assembly, fabrication, manufacturing or processing of natural resources. This credit is transferable and may be carried forward up to 14 years. SALES TAX INCENTIVES.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. The SBA takes a second lien on assets and finances up to 40 percent of the project cost, up to $1 million in some cases.

Income 75