Facilities Maintenance Checklist and Procedures
Job Order Contracting
SEPTEMBER 12, 2018
Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Load Bank Testing. Application: This standard applies to load bank testing. Where practical, load bank testing shall include transfer switches.
Let's personalize your content