article thumbnail

20 construction industry trends to watch in 2020

Building Radar

In the planning phase, aerial photographs from the remote-controlled aircraft provide the data material for 3D CAD or BIM model. They also help to compensate for the lack of skilled workers. On the construction site, they document the progress of construction work and help optimize the distribution of machines and manpower.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Load Bank Testing. Application: This standard applies to load bank testing. Load banks shall be of the reactive type rather than the resistive only type. Where practical, load bank testing shall include transfer switches. Load Bank Testing. FLSF-EPR-08-01Y Frequency: Annually. Special Instructions: 1.