Remove Banking Remove CAD Remove Drafting Remove Travel
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

The project proposes sustainable solutions for Detroit’s 48204 ZIP code • Led the initiative to transition from CAD to BIM construction documentation and introduced several technical innovations to streamline operations • Created a custom BIM content library with hundreds of host components and subcomponents. Cory Charles, 36.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Load Bank Testing. Application: This standard applies to load bank testing. Load banks shall be of the reactive type rather than the resistive only type. Where practical, load bank testing shall include transfer switches. Load Bank Testing. FLSF-EPR-08-01Y Frequency: Annually. Special Instructions: 1.