Remove Banking Remove Commissioning Remove DC Remove Mobility
article thumbnail

Stephen Tucker, a helping hand

The Korte Company

Army National Guard soldiers have been standing in for food bank volunteers ordered to shelter in place. With graduation comes a commission as a second lieutenant. Supporting food bank operations at home in Houston. The food bank was in dire need of help. The new normal at the food bank was bleak. Selfless service.

Houston 52
article thumbnail

BUSINESS REPORT: Texas – Innovation Moves Front And Center In Austin

Buisness Facilities Contributed Content

The device is based on dried blood spot (DBS) technology, which is best known for newborn screening and has many additional commercial uses for clinical trials, bio-banking, population studies and a wide range of medical research. The company has officially launched its mobile application and is available now on iTunes or Google Play.

Austin 73
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

Washington, DC 20417. Bank of America. Chatham County Commission. International Commissioning Engineers West, Inc. Mobile Janitorial & Paper Co. Take a look at the letter and please post you comments. July 25, 2012. Acting Administrator Daniel Tangherlini. General Services Administration. 1275 First Street, NE.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site Mobilization Meetings. 01 71 13 Mobilization. Site Mobilization Meetings. 01 71 13 Mobilization. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site Mobilization Meetings. 01 71 13 Mobilization. Site Mobilization Meetings. 01 71 13 Mobilization. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Low voltage, portable, AC/DC signal generator 2. Low voltage, portable, AC/DC signal generator 2. building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. ELEC-DCS-01-01M Frequency: Monthly. DC Battery System, Lead Acid. ELEC-DCS-01-01Y Frequency: Annually.