Remove Bidding Remove BIM Remove Change Orders Remove Fabrication
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. The business strategy leading to the integration of previously disparate competencies, business processes, technologies, and teams is the primary goal of a BIM execution plan.

BIM 40
article thumbnail

10 Construction Sessions You Might Have Missed at Autodesk University

Autodesk Construction Cloud

The introduction of BIM, cloud based takeoff tools, AI, and bidding platforms have all shaken up the way estimating and preconstruction management operates. . During this session, you’ll see the benefits of using Autodesk Construction Cloud along with tools like BIM 360 and Assemble.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM for Reinforced Concrete – Rebar clash prevention

BIM & Beam

This article is the continuation of a conversation that I started with the blog post depicting the value of BIM for Concrete and continued with from 2D to 3D with rebar detailing. When a clash is detected, an intervention (change order) is typically sent to detailers as the finding still comes late in the design to construction process.

BIM 47
article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Senior BIM Manager. Regarded as a pioneer of BIM technology at Amazon, Nima Jafari currently serves as the company’s Regional Senior BIM Manager, where he’s building the Emerging Technologies Department in Amazon TES from the ground up. Nima is no stranger to BIM. VDC/BIM Manager. Nima Jafari. Justin Maryak.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.