Remove BIM Remove Change Orders Remove Drawings Remove ProCore
article thumbnail

Trends in Construction: 3 Ways Technology is Changing Commercial Construction

HardHatChat

We would send those drawings to a printer to copy enough sets to distribute to all the trade partners we were asking to bid the project – often 50 or 60 copies. This time and expense added up to a pretty significant investment.

article thumbnail

Design-Build gets sweeter: Expanding a Hershey plant with a high-tech approach

The Korte Company

Over the next few months, Korte’s civil consultant TWM and Hershey’s in-house Building Information Modeling (BIM) team surveyed their existing structure, then shared these 3D point clouds with our team. The BIM team consistently upgraded us with new equipment designs and specifications as Hershey’s needs evolved. Instead, we plan.

Design 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some Best Construction Apps In Recent Times

Construction Cost Estimating

GoBIM This BIM based applications are widely utilized in the construction industry. GOBIM application creates the scope to operate 3D BIM models and their related data on the basis of the factors like number of triangles, number of parameters, and number of materials. For more information, visit this link 5.

article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

GoBIM : With GOBIM application you can navigate 3D BIM models and their associated data easily as BIM applications are widely used in the construction industry today. FingerCAD : FingerCAD is a CAD application for technical drawing with fingers assisted by computer.

iPad 45