What Is a Change Order?

Autodesk Construction Cloud

What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

4 No-Brainer Workflows with Autodesk Construction Cloud Connect 

Autodesk Construction Cloud

Fortunately, you can overcome these hurdles by using ACC Connect to sync drawings, field reports, and documents in the cloud. Using ACC Connect, you can integrate files and create custom workflows between SharePoint and Autodesk Build, Autodesk Docs, BIM 360, or PlanGrid. . 2: Project Management. 3: Contract Management.

Autodesk 105
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Design-Build gets sweeter: Expanding a Hershey plant with a high-tech approach

The Korte Company

Now, designers can use software like Revit and Navisworks to visualize wall thickness, layout, facility equipment and details like piping and ductwork. The BIM team consistently upgraded us with new equipment designs and specifications as Hershey’s needs evolved. We don’t draw blueprints by hand anymore. Instead, we plan.

Design 52
article thumbnail

Integrated project delivery method

Job Order Contracting

The JOC LEAN Integrated Project Delivery Method as well as, Integrated Project Delivery, IPD, and BIM, are dependent upon a CDE to drive collaboration and minimize error, omissions, and miscommunication. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

What Are Construction Specifications?

Autodesk Construction Cloud

During construction, specifics are everything and failure to communicate specifically could create massive change orders, cost overruns and schedule delays, which can negatively impact your bottom line. Failing to communicate construction building specs could result in massive change orders and increased risk.

article thumbnail

45+ of the Latest and Greatest Updates for Autodesk Construction Cloud 

Autodesk Construction Cloud

Autodesk BIM Collaborate . features on both Autodesk Construction Cloud unified platform and BIM 360 . Available on Autodesk Construction Cloud and BIM 360, a new “Description” column will be added to the Transmittal detail page.?The Cost Management | Collaborative Potential Change Order Workflow* .

article thumbnail

30+ New Updates for Autodesk Build

Autodesk Construction Cloud

Collaborative Potential Change Order Workflow* . features in both Autodesk Build and BIM 360 . This “look-around” feature brings a more dynamic and visual approach to modeling. . Available on A utodesk Construction Cloud and BIM 360, a new “Description” column will be added to the Transmittal detail page.?

Autodesk 105