Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Discrepancies in construction delivery methods and contracts lead to the failure of BIM, or many/most facility renovation, repair projects. The business strategy leading to the integration of previously disparate competencies, business processes, technologies, and teams is the primary goal of a BIM execution plan.

BIM 40
article thumbnail

5 Types of Subcontractor Software Transforming the TradesĀ 

Autodesk Construction Cloud

2: Change Management Software. One of the best ways to stay on top of change orders is through integrated communications. If you can handle them proactively, keeping teams and stakeholders informed of every update, then you can adapt to the necessity of change much faster. It should help you: . 5: Model-Centric Tools.

Software 105
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM for Reinforced Concrete ā€“ Rebar clash prevention

BIM & Beam

This article is the continuation of a conversation that I started with the blog post depicting the value of BIM for Concrete and continued with from 2D to 3D with rebar detailing. When a clash is detected, an intervention (change order) is typically sent to detailers as the finding still comes late in the design to construction process.

BIM 47
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements. 00 00 00 Procurement and Contracting. 00 20 00 Instructions for Procurement. 00 23 00 Procurement Definitions. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements. 00 00 00 Procurement and Contracting. 00 20 00 Instructions for Procurement. 00 23 00 Procurement Definitions. Requirements.

article thumbnail

The Value of NBIMS = The Value of BIM?

Building Information Management

The primary focus of the NBIMS-USā„¢ is to provide open standards to transform the currently inefficient and ineffective life-cycle management of the built environment… Is this not the same value provided by BIM? Identify specific reference standards that are used for BIM. Building Owner Perspective. Contractor Perspective.

BIM 45
article thumbnail

Public Law 111-308 ā€“ Federal Buildings Personnel Training Act ā€“ FBPTA ā€“ CORE COMPETENCIES

Building Information Management

Demonstrate knowledge and ability to maintain all HVAC Systems (clean, change and perform preventative maintenanceā€¦). Demonstrate knowledge and ability to repair all HVAC Systems (calibrate, change, fabricate, recover, replace and trouble shoot as requiredā€¦). o Work with procurement team to select contractor.