Remove BIM Remove Change Orders Remove Modeling Remove ProCore
article thumbnail

Design-Build gets sweeter: Expanding a Hershey plant with a high-tech approach

The Korte Company

Over the next few months, Korte’s civil consultant TWM and Hershey’s in-house Building Information Modeling (BIM) team surveyed their existing structure, then shared these 3D point clouds with our team. The BIM team consistently upgraded us with new equipment designs and specifications as Hershey’s needs evolved. And did both.

Design 52
article thumbnail

Trends in Construction: 3 Ways Technology is Changing Commercial Construction

HardHatChat

We’re also seeing the impact of exciting new developments like BIM (Building Information Modeling) technology, which gives us a 3-D picture of everything going on in a job site to better anticipate construction conflicts and issues.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

GoBIM : With GOBIM application you can navigate 3D BIM models and their associated data easily as BIM applications are widely used in the construction industry today. The size of the model handled by GoBIM depends on three factors- number of parameters, number of triangles and number of materials.

iPad 45
article thumbnail

Some Best Construction Apps In Recent Times

Construction Cost Estimating

GoBIM This BIM based applications are widely utilized in the construction industry. GOBIM application creates the scope to operate 3D BIM models and their related data on the basis of the factors like number of triangles, number of parameters, and number of materials.