Remove BIM Remove Compensation Remove Legal Remove Modeling
article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The “BIM Revolution” fizzled since technology was never the problem. LEAN AECOO impacts on every element of thinking, work, and business models. Changing work flows and business relationships, restructuring how organizations interact and are compensated is a requirement.

BIM 100
article thumbnail

BIM IP

Building Information Management

When discussing BIM with those yet to take it up the topic of Intellectual Property invariably comes up. It is so important to them it comes across as a major reason they are not using BIM (although I suspect it is more of an excuse). IP and BIM PROCESS. Money is only one form of compensation. Barter is another.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The errors and poor processes result in change orders, project delays, and legal disputes. Note: The use of national average cost data, area cost factors, construction cost indices, parametric cost modeling, historical cost data is NOT recommended. 10% are due to site related productivity issues, most of which could have been foreseen.

Schedule 163
article thumbnail

2024 Construction Trends: 30+ Experts Share Insight

Autodesk Construction Cloud

By leveraging 3D models in the field, teams can walk the projects, and ensure constructability and maintainability without having to wait for a designer to be brought on site. This could involve an increased focus on sustainable construction, leveraging advanced technologies like BIM, and adopting eco-friendly building practices.