Remove BIM Remove Consulting Remove Infrastructure Remove Negotiation
article thumbnail

10 Construction Sessions You Might Have Missed at Autodesk University

Autodesk Construction Cloud

The introduction of BIM, cloud based takeoff tools, AI, and bidding platforms have all shaken up the way estimating and preconstruction management operates. . During this session, you’ll see the benefits of using Autodesk Construction Cloud along with tools like BIM 360 and Assemble. Take a Load Off with DPR, Windover, and Arcadis.

article thumbnail

How to plan your warehouse layout

The Korte Company

Can these connections be customized, or must the site work with existing infrastructure that cannot be altered? As plans mature, we’ll likely use our 5D Macro BIM software. Contractors can then provide cost estimates (remember 5D Macro BIM?) For help, consult with racking system vendors early in the design process.

Plans 75
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Exciting products and fresh directions

Cassell Construction Estimating

ENR’s forecast for 2009 shows continuing declines in nearly all sectors of industrial, commercial, & residential markets, with modest growth only in public works highway and infrastructure work in 2010. Therefore the companies with solid presence in public works, and negotiated markets are best-positioned for the current recession.

Products 100
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). There are 49 Divisions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). There are 49 Divisions.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

This release represents the results of significant consultation with representatives from Federal departments and agencies, relevant professional societies, industry associations and apprenticeship training providers, as well as subject matter experts from academic institutions. o Basic Requirements o Infrastructure. Sustainability.