Remove BIM Remove Legal Remove Life Cycle Remove Modeling
article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The “BIM Revolution” fizzled since technology was never the problem. The “gorilla in the room” is that less than 5% of real property owners both understand and practice total cost of ownership life-cycle asset management. LEAN AECOO impacts on every element of thinking, work, and business models.

BIM 100
article thumbnail

The Legal Aspects of BIM

Building Information Management

Many remain confused about the meaning and value of BIM (building information modeling). BIM is the efficient full life cycle operation of the built environment, with the promise of managing Total Cost of Ownership (TCO) and associated physical and functional conditions in concert with an organization’s changing needs.

Legal 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Legal Aspects of BIM

Building Information Management

Many remain confused about the meaning and value of BIM (building information modeling). BIM is the efficient full life cycle operation of the built environment, with the promise of managing Total Cost of Ownership (TCO) and associated physical and functional conditions in concert with an organization’s changing needs.

Legal 40
article thumbnail

How the Brits View BIM – Buildling Information Modelling

Building Information Management

What is BIM? A multi-dimensional tool, Building Information Modelling (BIM) involves generating a visual model of the building which also manages data about it, at the design stage, throughout the construction phase and during its working life. NBS National BIM Report 2013. Introduction. Download report.

BIM 51
article thumbnail

What’s Really Needed to Make BIM Work.

Building Information Management

Building Information Management (that’s right forget the “modeling” distraction), BIM, is the life-cycle management of the built environment supported by digital technology. What is required to accomplish BIM? change management JOC life-cycle metrics procedure STRATEGY tools'

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Integrated Projects Delivery. Job Order Contracting.

article thumbnail

Collaborative, Efficient Construction Delivery Methods – The Real Obstacle to BIM

Building Information Management

The Architecture, Engineering, Construction, Operations, Owner (AECOO) sector must engage in collaborative construction delivery methods in over achieve any measurable performance improvement in the life-cycle management of the built environment. Building Information Management, Model and Modeling.

BIM 58