Remove BIM Remove Negotiation Remove Overhead Remove Software
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

See also Overhead, Indirect cost. See also, Overhead, General & Administrative Cost, Distributable. Overhead - In business, overhead or overhead expense refers to an ongoing expense of operating a business; it is also known as an "operating expense." in the execution of construction work activity.

article thumbnail

General Overview - Construction Cost Estimating Blog

Construction Cost Estimating

Under IAS 11, if a contract addresses two or more assets, the construction of each asset reported for individually if (a) separate proposals were submitted for each asset, (b) portions of the contract regarding each asset were negotiated independently, and (c) costs and revenues of each asset can be evaluated. IAS 11.10]. of the various i.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 61 13 Software Licensing Requirements. 08 33 23 Overhead Coiling Doors.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 61 13 Software Licensing Requirements. 08 33 23 Overhead Coiling Doors.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o Determine costs/pricing structure (labor, materials, overhead, etc.). Demonstrate the ability to work with Facilities team to negotiate rates and discounts. Demonstrate knowledge and ability to use Geographic Information System (GIS) and other Dept/Agency software programs in preparation of all required documents.