Validity of a Construction Cost Estimate – Public Sector
Job Order Contracting
MAY 4, 2023
All elements of the project must be reduced to a cost that can be accounted and budgeted at a line item level. The total cost of physically constructing the project in the time required based on current costs for labor, materials, equipment, mobilization, bonds, and profit. utility, railroad) costs. Construction Estimate.