Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

The way to deliver 96%+ of renovation, repair, and maintenance projects on-time, on-budget, and at the appropriate level of quality is to enable collaboration with contractors and other expert service providers. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Job Order Contracting Done Right! Open, Best Value, Efficient

Job Order Contracting

OpenJOC Job Order Contracting Framework embeds LEAN best management practices and Key Performance Indicators (KPIs) for cost, performance, and time, with an overall focus upon best value outcomes. Deliver construction projects on-time, on-budget, and to the satisfaction of owners. This is accomplished through the integration of.

Contract 100
article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

Crumbling Buildings, Roads, and Dams – Money Isn’t the Problem

Building Information Management

Overall, fewer than 10% of renovation, repair, or new construction projects are completed on-time, and on-budget, not to mention to the satisfaction of participants and users. Furthermore the overall construction process generally wastes 30%-60% of funds on delays, change orders, reworks, low productivity, and legal disputes.

Roads 40
article thumbnail

The Ultimate Guide to Choosing the Best Project Delivery Method

Autodesk Construction Cloud

While a project’s ultimate goal is a successful completion, the steps it takes to get there are critical to profits and project’s life cycle. By choosing the right one for your project, overall risk can be reduced, and budget and schedule can be better managed. No one model is perfect; all have benefits and drawbacks.

Risk 52
article thumbnail

Facilities are NOT Commodities – LEAN Best Management Practices

Building Information Management

The efficient and effective renovation, repair, sustainment, and new construction of facilities, other physical infrastructure and associated life-cycle management require knowledge, capability, transparency, collaboration, and robust business processes.