Remove CA Remove Certification Remove Commissioning Remove Feasibility
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Applicants must meet the same qualification criteria as Advantage Arkansas and must be approved by the Arkansas Economic Development Commission. Energy Commission to develop and deploy alternative and renewable fuels and advanced transportation technologies to help attain the state’s climate change policies.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals. Special Instructions: Fire Alarm System needs UL certification every five years.