Remove CAD Remove Change Orders Remove Modeling Remove Schedule
article thumbnail

#117:  Building Information Modeling

NH Construction Law

Over the past decade, Building Information Modeling (“BIM”) – computerized 3D portrayal of integrated building elements that allows a project or project subset to be built virtually before being built in the field – has become prolific in commercial construction. This is not your father’s CAD system.

article thumbnail

iPhone and iPad Applications Best Suited for Construction Professionals

Construction Cost Estimating

GoBIM : With GOBIM application you can navigate 3D BIM models and their associated data easily as BIM applications are widely used in the construction industry today. The size of the model handled by GoBIM depends on three factors- number of parameters, number of triangles and number of materials.

iPad 45
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some Best Construction Apps In Recent Times

Construction Cost Estimating

SmartBidNet will come up with available information to build bid projects easily and complete it in scheduled time. GOBIM application creates the scope to operate 3D BIM models and their related data on the basis of the factors like number of triangles, number of parameters, and number of materials. It can also be printed.

article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Candy maintains an interactive link among the Bill of Quantity (BOQ) and the construction program or schedule of work under one construction project management solution. Download CostX CostX can instantly capture exact measurements from scanned, PDF and CAD drawings together with formation of automatic BIM quantities from 3D/BIM models.

Bidding 40