Facilities Maintenance Checklist and Procedures
Job Order Contracting
SEPTEMBER 12, 2018
building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Obtain a current one-line drawing and verify meter is connected to the proper circuit.
Let's personalize your content