article thumbnail

The Utah Preconstruction Lien Process Explained

Levelset

This includes services such as land surveying, preparing drawings and specifications, and more. In Utah, a preconstruction lien is a form of payment protection for those that provide certain services before the construction phase of a project begins. Preconstruction liens v. construction liens.

Lien 52
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Determining the feasibility of using other DoD contracts. Include a statement of work, including concepts, sketches, and drawings; 3.6.1.3. Requirements for plans, sketches, drawings, etc; 3.6.2.5. To include considering historical information, projected funding opportunities, projected mission changes and bed-downs.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. All cash discounts should be deducted in determining material costs.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Participating companies are compensated by being able to reduce their federal income tax liability with a tax credit between $1,200 and $9,000 per qualified employee, depending on the target group. Hawaii-based companies that receive Phase I feasibility study SBIR awards can apply for funds from HTDC’s Hawaii SBIR Matching Grant program.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Obtain a current one-line drawing and verify meter is connected to the proper circuit.