Remove Cash Flow Remove Design Remove Profitability Remove Work in Progress
article thumbnail

Real-Time Work-in-Progress Figures — Construction’s Secret Weapon

ProcurementExpress.com

Work in progress figures might not sound like something you need to think much about. Yes, WIPs are considered current assets – meaning, accountants consider inventory assets to be current, as they are expected to turn into cash within the year. When the payment hits their account, they may mistake it for profit.

article thumbnail

Real-Time Work-in-Progress Figures — Construction’s Secret Weapon

ProcurementExpress.com

Work in progress figures might not sound like something you need to think much about. Yes, WIPs are considered current assets – meaning, accountants consider inventory assets to be current, as they are expected to turn into cash within the year. When the payment hits their account, they may mistake it for profit.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

5 Critical Construction Project Reports your System Should Pull Without Fuss

Viewpoint Construction Technology

At a bare minimum, you’ll need the following for your accounting function: profit and loss report, balance sheets, trial balance and trading summaries. A modern system will also have integrated contract valuation capabilities (which results in auto-generated work-in-progress accounting entries). Asset and Plant Management.

Cash Flow 130
article thumbnail

Construction Business Owner Blogs

Construction Business Owner

Customer Collaboration & Construction Software » Staying Focused in the Fight Against Profit Fade. Just about every contractor has been there — a project starts out strong but, as it moves forward, delays and incidental added work and changes knock dollars and cents off of the bottom line. Home » Blogs.

article thumbnail

Steps To Obtaining A Surety Bond

Contractor Bookkeeping

After you have obtained your bond, the surety will likely ask you to prepare quarterly schedules of work in progress. This includes such information as whether you have overbilled or underbilled the project – change order issues, revisions to cost estimates, estimated final gross profits and anticipated completion dates.