Remove Cash Flow Remove Design Remove Project Management Remove Work in Progress
article thumbnail

Real-Time Work-in-Progress Figures — Construction’s Secret Weapon

ProcurementExpress.com

Work in progress figures might not sound like something you need to think much about. In the construction industry, WIPs cover the raw materials, plus labor and overhead, used as part of a project. But, procurement , project management, and the C-suite should all monitor WIP closely. That’s accounting’s job, right?

article thumbnail

Real-Time Work-in-Progress Figures — Construction’s Secret Weapon

ProcurementExpress.com

Work in progress figures might not sound like something you need to think much about. In the construction industry, WIPs cover the raw materials, plus labor and overhead, used as part of a project. But, procurement, project management, and the C-suite should all monitor WIP closely. That’s accounting’s job, right?

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

5 Critical Construction Project Reports your System Should Pull Without Fuss

Viewpoint Construction Technology

The main reason construction businesses implement an integrated project management system is for the visibility that they can gain over every aspect of a project. Here’s a list of key reports that you should be able to pull at any moment from your construction project management software: Basic Accounting Reports.

Cash Flow 130
article thumbnail

What is Project Loss Insurance?

Levelset

When a loss occurs, it can put a real crunch on a contractor’s cash flow. Project loss insurance has the potential to save contractors from devastating project losses, no matter the cause. Project loss insurance, or PLI, is designed to mitigate catastrophic construction project losses.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

Before work begins, understand fully what you’ve contracted to do by carefully reviewing the contract at hand. Legal language is often unclear, resulting in differences in interpretations that can disrupt and delay projects, increasing costs. Also make sure your project managers understand the contract language fully.