Remove Certification Remove Commissioning Remove Drafting Remove Leases
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

The drafting process was widely criticized resulting in a document that has never been enacted anywhere, and likely should not ever be adopted as code. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning. Sec 901.4.1.4. Sec 1001.3.2

Green 156
article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 136
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

The federal Bureau of Land Management, which has subsurface mineral rights for much of the Monterey shale field, in December sold about 15 leases for thousands of acres of potential shale development in California. It is anticipated that the Draft EIR will be brought before the Planning Commission for certification in March 2013.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. If applying for a transferable credit certificate, no more than half the credit may be applied in a single calendar year.

Income 108
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Fire Life Safety (Fire Alarm) system testing shall be performed by a licensed and certified testing company as required to maintain the building UL certification. Check Points: 1. Refer to NFPA 72.