Remove Change Orders Remove CSI Remove Design Remove Legal
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste.

article thumbnail

Why Facilities Repair, Renovation, and Construction Projects Fail

Job Order Contracting

Traditional project delivery methods, and even design-build, fail to consistently produce the superior outcomes of LEAN construction methods such as Integrated Project Delivery and Job Order Contracting.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

#119:  Quantum Meruit vs Unjust Enricment

NH Construction Law

Two of the most popular legal theories beyond breach of contract claims are “unjust enrichment” and “quantum meruit.” Unjust enrichment is what lawyers refer to as an “equitable” remedy, distinguished from a “legal” remedy (such as for breach of contract). CSI-Concrete Systems, Inc.

Equity 40
article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

LEAN methods provide a proven integrated, coordinated, and efficient way to manage all project and program phases (from design through construction, into operation, and beyond). Change orders and legals disputes are all but eliminated. LEAN Facilities Management / LEAN Construction Delivery. The Obstacles.

article thumbnail

Job Order Contracting Done Right! Open, Best Value, Efficient

Job Order Contracting

OpenJOC uses common, standardized terms, definitions, and data architectures (CSI Masterformat licensee) to minimize cross discipline data gaps and errors and to improve collaboration. Coordination of teams and information, reducing errors, omissions and miscommunications, and virtual elimination of change orders and legal disputes.

Contract 100
article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. Standardized Cost Data.

article thumbnail

Attention Construction Contractors – Collaboration is Key to Customer Experience

Job Order Contracting

Financial and Project Composition Transparency – The use of a locally researched line item detailed unit price book , UPB, organized using CSI Masterformat (50 Division). Change orders and legal disputes can virtually be eliminated. Time for you to get started?