4 No-Brainer Workflows with Autodesk Construction Cloud ConnectÂ
Autodesk Construction Cloud
NOVEMBER 16, 2022
Fortunately, you can overcome these hurdles by using ACC Connect to sync drawings, field reports, and documents in the cloud. Through ACC Connect, teams can automatically send contracts or change orders from Autodesk Build, BIM 360 for signing via e-signature tools such as DocuSign or Dropbox Sign to drive consistency and save time.
Let's personalize your content