Remove Change Orders Remove Environment Remove Life Cycle Remove Security
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

To meet their responsibilities as stakeholders of the built environment ( facilities and other built structures ), public sector owners need to have the ability create credible construction cost estimate for ALL repair, renovation, maintenance (FSRM), and new build projects.

article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

Field specific variables, such as weather, on-going operations, soils conditions, security, safety, site lay-out, environment protections and other contexts must be considered as well as the means and methods of work execution. A “FACEBOOK for Facilities Construction and Life-cycle Operations” is on the horizon.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM and Cloud Computing – Get Beyond 3D Visualization and Focus Upon the “I”

Building Information Management

Both technologies also embed associated business process rules and components which will enable enhanced life-cycle management of the built environment, alignment of structures with organizational mission, and better consideration of general community impacts. Major cultural change within the AECOO sector, 2.

BIM 78
article thumbnail

What Is a Digital Twin? 

Autodesk Construction Cloud

This connected system can improve the asset’s entire life cycle from the pre-project stage to the end-of-life stage. For this reason, digital twins are gaining traction in the built environment sector, even though several questions remain unanswered. submittals, change orders, RFIs, etc.).

BIM 98
article thumbnail

Collaborative, Efficient Construction Delivery Methods – The Real Obstacle to BIM

Building Information Management

The Architecture, Engineering, Construction, Operations, Owner (AECOO) sector must engage in collaborative construction delivery methods in over achieve any measurable performance improvement in the life-cycle management of the built environment. Building Information Management, Model and Modeling. RSMeans strategic partner.

BIM 58
article thumbnail

My BIM is Your BIM – Owners, Contractors, AEs, Building Users, Oversight Groups, Business Product Manufacturers, Community ….

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. BIM first and foremost about early and ongoing collaboration, continuous improvement, and robust life-cycle management process supported with integrated technology and standardized information.

BIM 40
article thumbnail

Sustainability of DOD Buildings – Reuse of Existing Buildings

Building Information Management

Incorporate life-cycle GHG emissions analysis into DoD MILCON and SRM programs. Efficient project delivery methods are of critical importance to the task of sustainability and life-cycle management of the built environment. Virtual elimination of legal disputes, claims and mitigation of change orders.