article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Improve AECOO Performance Today!

Job Order Contracting

I have dedicated a fair portion of my life to improving physical asset life-cycle total cost of ownership management. This has enabled me to work with commercial property owners and associated service partners of all sizes, including the largest.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting LEAN Construction Technology

Job Order Contracting

Supports multiple Unit Price Books and Detailed Line Item Commercial Construction Costs Databases. CSI Masterformat (TM) UPB format (50 Division) for data organization. Support and training from a team that has decades of experience LEAN consturction delivery and life-cycle facilities / infrastructure asset management.

Contract 100
article thumbnail

Community-based Construction Cost Estimating

Job Order Contracting

Use of licensed CSI MasterFormat. Costs reflect standard commercial construction specifications for the location. Developed by experienced line item cost engineers, project managers, and life-cycle cost professionals. Line items reflect approximate quantities according to a trade break down.

article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Unit Price Book – UPB & Line Item Cost Estimating

Building Information Management

LEAN construction delivery methods , proven to be significantly more efficient that traditional design-bid-built, or even design-build, are based upon stakeholder collaboration from the very beginning and right thru the end of a project’s or structure’s life-cycle.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. FM Global is one of the world’s largest commercial and industrial property insurance and risk management organizations specializing in property protection. and General Manager of R.S.

BIM 45