Remove Commissioning Remove DC Remove Design Remove Leases
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

for the Design of High Performance Green Buildings Except Low-Rise Residential Buildings. which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. Note, the 2017 edition of Standard 189.1

Green 156
article thumbnail

BUSINESS REPORT: Texas – Innovation Moves Front And Center In Austin

Buisness Facilities Contributed Content

Every year, tens of thousands of people descend on the city for South by Southwest (SXSW), a nine-day stretch of festivals and conferences designed to highlight the hottest new entrants in the world of music, film and technology. serves the world’s most innovative electronics companies with analog and digital semiconductor design.

Austin 73
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

Washington, DC 20417. If GSA, as the “landlord of the federal government,” were to require or use something else, it would add cost to the building and leasing process across the building industry. 2M Design Consultants, Inc. Bork Architectural Design, Inc. BRC Acoustics & Audiovisual Design. July 25, 2012.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

Launched by the Shale Gas Innovation and Commercialization Center (SGICC), the initiative is designed to harness entrepreneurial innovation to maximize the economic return from the Marcellus and Utica shale formations. A 2009 study commissioned by the State of Utah has identified 2,166 MW of geothermal potential existing with the state.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check all analog inputs work across the full range of designed input. Low voltage, portable, AC/DC signal generator 2. Check all analog input work across the full range of designed input. Low voltage, portable, AC/DC signal generator 2. Application This standard is intended for Child Care secured perimeter systems.