article thumbnail

Nevada Stops Subsidizing Net Metering

Green Building Law Update

In the final days of 2015, Nevada became the front line in the looming nationwide fight over energy policy when the Public Utilities Commission of Nevada altered rates for net metering impacting homeowners with rooftop photovoltaic panels.

Nevada 120
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

which for the first time requires “for individual leased, rented, or other tenant or subtenant space within any building totaling in excess of 50,000 ft2 (5000 m2), separate submeters shall be provided.”. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning.

Green 156
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BUSINESS REPORT: Texas – Innovation Moves Front And Center In Austin

Buisness Facilities Contributed Content

Fridays and is expanding to other cities including Seattle, San Francisco, Portland, Denver, DC, Dallas and Houston. These combined projects will result in more than $221 million in new capital investment, 1000 new jobs, 2,000 retained jobs and more than 423,000 square feet of newly constructed or leased space.

Austin 73
article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

Washington, DC 20417. If GSA, as the “landlord of the federal government,” were to require or use something else, it would add cost to the building and leasing process across the building industry. Chatham County Commission. International Commissioning Engineers West, Inc. Commissioning WorCx. July 25, 2012.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

A 2009 study commissioned by the State of Utah has identified 2,166 MW of geothermal potential existing with the state. grids using a massive network of underground superconductor pipelines and AC/DC converters, eventually opening the entire country to renewable energy access. These three new projects amount to over $1.25

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Low voltage, portable, AC/DC signal generator 2. Low voltage, portable, AC/DC signal generator 2. building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. ELEC-DCS-01-01M Frequency: Monthly. DC Battery System, Lead Acid. ELEC-DCS-01-01Y Frequency: Annually.