Remove Commissioning Remove DC Remove Drawings Remove Leases
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

But draw your own conclusions: This 2018 IgCC contains requirements that address site sustainability, water use efficiency, energy efficiency, indoor environmental quality, materials and resources, and construction and plans for operation. Washington DC, Baltimore City, Montgomery County, Maryland, etc.) Sec 1001.3.2 The 2015 IgCC (.

Green 156
article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

Washington, DC 20417. If GSA, as the “landlord of the federal government,” were to require or use something else, it would add cost to the building and leasing process across the building industry. Chatham County Commission. Drawing Conclusions LLC. International Commissioning Engineers West, Inc. July 25, 2012.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

A 2009 study commissioned by the State of Utah has identified 2,166 MW of geothermal potential existing with the state. grids using a massive network of underground superconductor pipelines and AC/DC converters, eventually opening the entire country to renewable energy access. These three new projects amount to over $1.25

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Low voltage, portable, AC/DC signal generator 2. Low voltage, portable, AC/DC signal generator 2. building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings.