Remove Commissioning Remove Drafting Remove Drawings Remove Regulation
article thumbnail

Protecting hospital patients from power outages

CK Power

Regulations and precautions. Clients are guided through all applicable regulatory requirements such as NFPA 110 , NFPA 99, the Joint Commission , FM Global standards, IBC seismic requirements and the National Electrical CodeĀ®. . Drawing plans and awarding contracts.

article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

The drafting process was widely criticized resulting in a document that has never been enacted anywhere, and likely should not ever be adopted as code. The reworked provisions for construction and plans for operation , now combined in chapter 10, are much more than systems commissioning. Sec 901.4.1.4. Sec 1001.3.2

Green 156
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check throw regulator and spring assembly for tightness. building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check operation of all relays, pilot valves, and pressure regulators. Verify correct main line pressure leaving the main line air regulator.

article thumbnail

Industry Focus: Logistics ā€“ Going With The Flow

Buisness Facilities Contributed Content

percent in 2012, the industryā€™s delicate balance between supply and demand will likely be disrupted due to new regulations. With all this available as a draw to the region, it is not surprising that an eager and ample work force is available in an enviable business climate. While trucking transportation costs rose 2.9 Great Lakes U.S.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

With 32 ports statewide, Louisiana offers six deep-draft ports capable of transferring large quantities of cargo, is one of only two U.S. The developer, Houston-based Clean Line Energy, is awaiting approval from regulators in Iowa and Illinois before going ahead with the direct current line. Already the nationā€™s No.