Remove Commissioning Remove Estimating Remove Fabrication Remove Life Cycle
article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. Ontology for Life-Cycle Modeling of Heating, Ventilating, and Air Conditioning (HVAC) Systems. 2012-03-01-CERL-CR-12-2-ModelView. Model View Definition.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. Ontology for Life-Cycle Modeling of Heating, Ventilating, and Air Conditioning (HVAC) Systems. 2012-03-01-CERL-CR-12-2-ModelView. Model View Definition.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

The additional infrastructure needs or talent required to be successful in life-cycle data collection & analysis. Collaborative Estimating Workflows for Preconstruction and VDC Teams. The potential value in analyzing data and how you can use it to drive better decision-making. Fortunately, there’s a better way.

article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards. BIM Life-Cycle Views. Life-cycle Assessment. Life-cycle Costs. Life-cycle Stages. Discipline. link] 14040:2006.

BIM 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 43 26 Estimated Quantities Form. 01 43 19 Fabricator Qualifications. 01 90 00 Life Cycle Activities. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 43 26 Estimated Quantities Form. 01 43 19 Fabricator Qualifications. 01 90 00 Life Cycle Activities. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. 01 91 16 Facility Substructure Commissioning. Foundation Commissioning. Basement Construction Commissioning.

article thumbnail

The Value of NBIMS = The Value of BIM?

Building Information Management

The primary focus of the NBIMS-US™ is to provide open standards to transform the currently inefficient and ineffective life-cycle management of the built environment… Is this not the same value provided by BIM? I am interested in getting designers and contractors to specify and purchase my product. How to mitigate risk.

BIM 45