Remove Commissioning Remove Feasibility Remove Leases Remove Risk
article thumbnail

Top 10 Companies for Environmental Engineers to Work For

CivilJungle

Our beliefs are strong, enabling us to take risks without hesitation and find solutions the world needs. Our services include spare parts supply, and build-own-operate (BOO) and maintenance contracts, technical audits, leased water treatment systems, technical training, and remote monitoring. – 361.00 www.ewgroup.in.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

CAPCO financing, an alternative to conventional bank financing, can accommodate a slightly higher risk profile and provide a more flexible structure for growing businesses. The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

CAPCO financing, an alternative to conventional bank financing, can accommodate a slightly higher risk profile and provide a more flexible structure for growing businesses. The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company.

Income 75
article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

SGICC will use the bulk of the D2PA funds to provide grants to PA-based small companies to demonstrate the feasibility of emerging technologies, or seed funds to test and help launch ideas, and to assist in market acceptance and growth of shale energy focused products or services. These three new projects amount to over $1.25

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. If arc flash labeling is not provided, assume hazard risk category “Dangerous” and perform operations in the following sequence: De-energize equipment 2. Remove covers 3. De-energize equipment 2. Remove covers 3.