Remove Compensation Remove Electrical Remove Inventory Remove Remodeling
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

North Dakota Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

Loans can be used for working capital, inventory and small equipment. Installation costs may not include costs of redesigning, remodeling or otherwise altering the structure of a building in which the device is installed. . MATCH Program: Designed to encourage and attract financially strong companies to North Dakota.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Inventory is exempt from property tax. Equipment or transmission lines used directly in producing or transmitting electrical power, but not including distribution. 200,000 megawatt-hours of electricity equals 200 million kWh which, when multiplied by 1¢ per kWh, equals $2 million in credit.)

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Loan proceeds are to be used for working capital, inventory, equipment purchase, and real property improvements but cannot be used for refinancing of existing debt or outstanding debt payments. Funds may be used to acquire equipment, make leasehold improvements, purchase recycled raw materials and inventory or acquire real property.

Income 75