Remove Compensation Remove Feasibility Remove IDEA Remove Security
article thumbnail

The Utah Preconstruction Lien Process Explained

Levelset

Many Utah contractors are familiar with the construction lien process to secure payment for work or materials used in a building project. Here’s a breakdown of everything you need to know to secure, perfect, and enforce a preconstruction lien in Utah. What is a preconstruction lien? Preconstruction liens v. construction liens.

Lien 52
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Security Bollards/Barricade. Application: This standard card applies to automatic hydraulic security Bollards/Barricades found at driveway entrances, and other areas where vehicular traffic must be controlled. Notify affected personnel before performing PM (alarmed or security entrances). Gates and Fences, Security and Access.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The Participating Lender sets all the terms and conditions of the loan (including premium levels, maturity dates, fixed or variable interest rates, secured or unsecured, amortization schedule, etc.) The Securities Industry and Financial Markets Association tracks the weekly average municipal interest rate from 2000 to current.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

FOREIGN TRADE ZONES (FTZs): Secured areas legally outside of U.S. The company’s obligation to repay the loan is secured by a direct-pay Letter of Credit from a bank rated ‘A’ or better. corporations whose sole activities in CT are trading stocks, securities or commodities of their own account. See georgiainnovation.org.

Income 75
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

A single award ID/IQ contract often makes it difficult for the government to secure the same price reductions and contractor performance improvements that would occur if the contractor was competing against other qualified contractors throughout the contract. The NIH facilitators then obtained consensus for each section of the draft RFP.