Remove Conference Remove Design Remove Drawings Remove Railroad
article thumbnail

Global Growth Surge in Southwest Louisiana

Business Facilities

While standing next to each other during a press conference, Louisiana Governor John Bel Edwards and Lotte CEO Soon Hyo “Steve” Chung told a group of onlookers that the company would establish its headquarters in Lake Charles (relocating from Houston). Mary Parish draws upon a regional workforce of over 400,000 workers.

article thumbnail

STATE FOCUS: Lassoing Jobs In Texas

Buisness Facilities Contributed Content

Texas’ commitment to growth through innovation is manifested in the Texas Emerging Technology Fund (TETF), a grant program designed to expedite the development and commercialization of new technologies through partnerships between the state, higher education institutions, and private industry. TOMBALL IS TRUE TO ITS ROOTS.

Texas 49
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. SALES & USE TAX ABATEMENTS: Taxes on construction-related transactions, pollution control devices are exempt from sales and use taxes.

Income 75
article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

Launched by the Shale Gas Innovation and Commercialization Center (SGICC), the initiative is designed to harness entrepreneurial innovation to maximize the economic return from the Marcellus and Utica shale formations. So evolved is Louisiana’s pipeline infrastructure that the state’s No. times that of the Nos. O’Brien said.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). design/negotiate/build). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). design/negotiate/build). Requirements.