Remove Conference Remove Documentation Remove Railroad Remove Subcontracting
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 32 33 Photographic Documentation.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 32 33 Photographic Documentation.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Funds may be provided for the construction and/or improvement of water lines & wastewater facilities, sewer lines, sewage treatment facilities, roadways, natural gas-line services, electric power services, railroad spurs, lighting, sidewalks and alternative power sources such as solar. Railroad Spurs. Natural Gas-Line Services.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Funds may be provided for the construction and/or improvement of water lines & wastewater facilities, sewer lines, sewage treatment facilities, roadways, natural gas-line services, electric power services, railroad spurs, lighting, sidewalks and alternative power sources such as solar.

Income 75