Remove Conference Remove Lien Remove Negotiation Remove Software
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Labor costs will be reimbursed to the Contractor at the unit price rate multiplied by the Contractor negotiated coefficient(s). Supervisory costs are to be part of Contractor’s negotiated coefficient and will not be reimbursed as a separate labor. Any equipment reimbursements must be approved by the Owner prior to its use.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

This includes property such as microscopes, chemical reagents, and software. The program covers the cost of lease hold improvements dedicated to high speed digital technology; plant expansions to house IT systems; devices and systems to safeguard wireless networks; hardware; software and more.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The private sector participant finances 50 percent of the project cost and takes a first lien on assets pledged as collateral. The SBA takes a second lien on assets and finances up to 40 percent of the project cost, up to $1 million in some cases. This includes property such as microscopes, chemical reagents, and software.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 61 16 Lien Bond Form. Affidavit of Release of Liens Form. Requirements.