Remove Construction Remove Feasibility Remove Maryland Remove Permits
article thumbnail

Solar Panels Mandated for Muscle Beach and.

Green Building Law Update

All building permit applications, including for alterations to the city’s iconic Muscle Beach, will now be subject to these local amendments, which include: All new one and two family dwellings are required to install a solar electric photovoltaic system with a minimum total wattage 1.5

Baltimore 198
article thumbnail

Solar Panels Mandated for Muscle Beach and.

Green Building Law Update

All building permit applications, including for alterations to the city’s iconic Muscle Beach, will now be subject to these local amendments, which include: All new one and two family dwellings are required to install a solar electric photovoltaic system with a minimum total wattage 1.5

Baltimore 120
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

Under a public-private partnership (P3) agreement with Ports America Chesapeake, a 50-foot deep container berth was constructed in 2012. According to Maryland Gov. The P3 project is a 50-year agreement between the Maryland Port Administration (MPA) and Ports America Chesapeake to lease and operate the 200-acre Seagirt Marine Terminal.

article thumbnail

COVER STORY: Global Biotech Report

Buisness Facilities Contributed Content

The biopharmaceutical facility was constructed with an investment of 65 million Euros. The construction of the new life sciences incubator was officially launched in November 2012 by the Secretary of Economy and Foreign Trade, Etienne Schneider. Construction of the project began in April 2009 and was completed in December 2011.

Florida 63
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

It allows for the construction of roads, bridges, etc. Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g.,

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. SALES & USE TAX ABATEMENTS: Taxes on construction-related transactions, pollution control devices are exempt from sales and use taxes. It allows for the construction of roads, bridges, etc.

Income 75