Remove CSI Remove Design Remove Estimating Remove Life Cycle
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

A credible construction cost estimate is required prior to engaging in procurement. The follow elements are common to a credible construction cost estimate. Credible Cost Estimate Core Elements #1 Objectivity – The information used and those invovled in the creation of the construction cost estimate must be objective.

article thumbnail

Construction Cost Estimating 2020 and Beyond – Must Reading for Owners

Job Order Contracting

Construction cost estimating is critical to the success of any repair, renovation, maintenance, or new build, and the consistent achievement of best value outcomes. Levels of Construction Cost Estimates. The are many levels of construction cost estimates based upon a “project” life-cycle.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Open Construction Cost Estimating

Job Order Contracting

Open Construction Cost Estimating for 2018 and Beyond! Create you own line items from a core line item database, build estimates, manage projects, store and view virtually all forms of documents. Understand and explore solutions jointly using a common data environment based upon CSI Masterformat. Mitigate variance and risk!

article thumbnail

Introduction to Current Construction Cost ESTIMATING Techniques 

Job Order Contracting

Introduction to Current Construction Cost ESTIMATING Techniques . Robust construction cost estimating is critical to improving productivity, quality, delivery times, cost control, and overall satisfaction for any renovation, repair, or new project. ESTIMATING FORMATS. TYPES OF ESTIMATING & ESTIMATES.

article thumbnail

Integrated Project Delivery Software and Support Services

Job Order Contracting

Integrated Procurement, Design, and Construction REQUIRES Direct Owner Involvement and Leadership from Predesign Through Closeout and Beyond: Planning and performance management collaboratively and at a systemic level. Common Data Environment.

Software 150
article thumbnail

LEAN Job Order Contracting

Job Order Contracting

Asset Life-cycle Total-cost-of-ownership (TCO) Management www.4BT.us. As the shift to a LEAN operating environment takes time, training incorporates a phased approach designed to support gradual adoption and improvement. TOOLS AND SERVICES. All of the tools and services required to implement LEAN JOC are readily available.

Contract 165
article thumbnail

LEAN Job Order Contracting Intro 3

Job Order Contracting

Scope validation phase is longer and more intense than traditional design bid build, or other “so-called” JOC programs. Industry standard terms, and clear, concise definitions in plain English are REQUIRED, as well as standardized data formats (CSI MasterFormat). The Evolution of Construction Cost Estimating Technology.

Contract 100