article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Low voltage, portable, AC/DC signal generator 2. Low voltage, portable, AC/DC signal generator 2. ELEC-DCS-01-01M Frequency: Monthly. DC Battery System, Lead Acid. ELEC-DCS-01-01Y Frequency: Annually. DC Battery System, Lead Acid. Check all plug connections in the panel to ensure the plugs are fully seated.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

With 32 ports statewide, Louisiana offers six deep-draft ports capable of transferring large quantities of cargo, is one of only two U.S. The Iowa wind energy industry supports up to 7,000 jobs, third in the country in employment related to the wind energy industry. Already the nation’s No. 2 crude oil producer and No.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Copies of this publication may be obtained from the Executive Office of the President’s Publications Office by calling 202-395-7332, or writing the Office of Publications, 725 17th Street, NW, Room 2200, New Executive Office Building, Washington, DC 20503. The NIH facilitators then obtained consensus for each section of the draft RFP.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 45 36 Equal Employment Opportunity Affidavit. 00 73 36 Equal Employment Opportunity Requirements. 23 51 13 Draft Control Devices. Draft Control Fans. Draft-Induction Fans. 23 65 13 Forced-Draft Cooling Towers. Open-Circuit, Forced-Draft Cooling Towers. Closed-Circuit, Forced-Draft Cooling Towers.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 45 36 Equal Employment Opportunity Affidavit. 00 73 36 Equal Employment Opportunity Requirements. 23 51 13 Draft Control Devices. Draft Control Fans. Draft-Induction Fans. 23 65 13 Forced-Draft Cooling Towers. Open-Circuit, Forced-Draft Cooling Towers. Closed-Circuit, Forced-Draft Cooling Towers.