Remove Design Remove Drafting Remove Mobility Remove Railroad
article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

An airport of entry (AOE), usually designated with the word “international”, provides customs and immigration services for incoming flights. Ports also play a role in national security by supporting the mobilization, deployment and resupply of U.S. military forces. stay competitive with foreign manufacturers and suppliers.

Risk 40
article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

In comparison, railroads are in a much better position regarding infrastructure, equipment and personnel. Three Class I railroads (Norfolk Southern, Canadian Northern and the CSX) serve Decatur and are directly interconnected through a privately owned intermodal ramp as part of the Midwest Inland Port. Subsequently, the U.S.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LOCATION FOCUS: California Dreamin’ – A Rebound Fueled By New Energy

Buisness Facilities Contributed Content

With so many states trying to lure businesses to their cities, why have such pioneering companies as Intel, Siemens Mobility, Micron and SynapSense chosen to call Sacramento, California home? that are LEED-certified (Leadership in Energy and Environmental Design). SMUD: ENERGY INNOVATORS. million for Hesperia’s businesses.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

TVA Economic Development Loan Fund: A multimillion-dollar revolving loan program designed to stimulate investment and job creation in the TVA region. 573), was enacted in 1987 to stimulate business and industrial growth in designated areas of the state that are considered economically depressed. In December 2002, the former U.S.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.