article thumbnail

Validity of a Construction Cost Estimate – Public Sector

Job Order Contracting

In preparing a cost estimate, a value analysis must be performed concurrently to establish the appropriate selection, means, and methods of each tasks to ensure the lowest possible life-cycle cost per the approved detailed scope of work. Estimate includes all initial preliminary engineering costs and final design costs.

article thumbnail

Behind the Build: Interview with Isabel Harlan, Sr. Engineer and Project Manager at Hatch LTK

Autodesk Construction Cloud

.” No matter where you are, the infrastructure around you likely has an impact on your daily life. For those working in infrastructure, there are always projects to address, like designing signals and traction power or performing maintenance. . Then, I got curious about the construction side. Isabel Harlan, Sr.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Designated Official” is the highest ranking official of the primary occupant agency of a Federal facility, or, alternatively, a designee selected by mutual agreement of occupant agency officials. Disposal agency” means the Executive agency designated by the Administrator of General Services to dispose of surplus real or personal property.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Designated Official” is the highest ranking official of the primary occupant agency of a Federal facility, or, alternatively, a designee selected by mutual agreement of occupant agency officials. Disposal agency” means the Executive agency designated by the Administrator of General Services to dispose of surplus real or personal property.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). design/negotiate/build). 01 33 16 Design Data.