Remove Design Remove Procurement Remove Project Management Remove Roads
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

There are four phases of project management which are required to manage projects efficiently on quality, time and costs. Defining and organizing the project: Defining project is the first step in the project management process.

article thumbnail

WHAT IS PROJECT MANAGEMENT?

The Constructor

WHAT IS PROJECT MANAGEMENT? Tweet A project is a set of interrelated activities, usually involving a group of people working together toward a common goal or objective over a period of time. Not surprisingly, project management requires strong organizational, budgeting, staffing, controlling, and communication skills.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

Mandatory early and ongoing collaboration for each project. Integrated planning, procurement, and project delivery processes and team. Characteristics of Strategic Collaboration and Efficient Construction Project Delivery. Lower project related cost growth. Management, 6(3), 159-168. Management Institute.

article thumbnail

Sellar gets go-ahead 444-bed London student scheme

Construction Enquirer

Site owner Southwark Homes brought in Sellar as development manager to advance the student accommodation project replacing earlier plans for a hotel and flats at the Harper Road and Borough High Street site. The project will be an all-electric building that could be carbon-free through green power procurement.

Retail 59
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

Job Order Contracting Services & Tools

Job Order Contracting

4BT develops and maintains JOC unit price books containing costing data for individual construction tasks for a wide range of general construction, maintenance, repair, and construction of facilities, roads, parking lots, and other construction-related components typically encountered by real property owners.

Contract 100