article thumbnail

GRESB Results: A Guide to Interpreting and Improving Your Score

Stok

ESG Breakdown: Each question has been assigned an E, S, or G (see Scoring Document ). 3: Strengths and Opportunities Per Aspect • Strengths and Opportunities: This is a great visual to show the areas in which an entity is excelling and areas where improvements need to be made. Challenges vary by asset type.

article thumbnail

GRESB Results: A Guide to Interpreting and Improving Your Score

Stok

ESG Breakdown: Each question has been assigned an E, S, or G (see Scoring Document ). Strengths and Opportunities: This is a great visual to show the areas in which an entity is excelling and areas where improvements need to be made. For all questions that did not earn full credit, compare the responses to the scoring document.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEED Abandoned by DOD?

Building Information Management

This year a new construction code for high-performance, sustainable buildings, is expected that will govern all new construction, major renovations and leased space acquisition. This new code, based heavily on ASHRAE 189.1, Full Testimony.

Defense 45
article thumbnail

Five Benefits of Inspection Reporting Software

Lets Build

How often have you cursed your company’s filing systems while hunting fruitlessly through online directories or paper filing systems in search of a document? Inspection reporting software provides a unified home for any property-related documentation , combining contemporary and historic reports in a single location.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect for corrosion. Make a visual inspection of the flue and chimney, checking for obstructions. As of this writing, the most recent document was authored in 1997. As of this writing, the most recent document was authored in 1997. As of this writing, the most recent document was authored in 1997.

article thumbnail

FEATURE STORY: 2014 Economic Development Awards

Buisness Facilities Contributed Content

Payments will be made on a reimbursement basis upon submission of proper documentation and approval by the IEDA. million to lease, renovate and equip a 56,800 square-foot facility in Munster. Total reimbursement for ETAP participants shall not exceed $3,000 per event, with a maximum of three ETAP grants per application period.

Indiana 108
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. Small Producer Credit (AS 43.55.024(c)): Credit of up to $12 million per year for taxpayers incurring eligible oil and gas lease expenditures in North Slope operations.

Income 108