Remove Drafting Remove Inspections Remove Software Remove Subcontracting
article thumbnail

Top OSHA Violations in Construction (2021)

Levelset

In this article, we’ll look at the top 10 violations found during OSHA inspections in 2021, the cost of OSHA violations, and how to prevent them. OSHA averages more than 30,000 inspections annually , including many unscheduled visits arising from employee complaints or injuries. Citations: 5,465 Inspections: 5,327 Penalties: $28.8

OSHA 52
article thumbnail

Behind the Build: Interview with Matthew Keck, BIM Manager at Metromont 

Autodesk Construction Cloud

Here in Greenville, we subcontract the erection, but we oversee it. I continued grading until 2015, then went to school for drafting and design, where I was introduced to Autodesk products and BIM. We put them together with instructions. That’s basically what we do. As for my specialty, I’m a BIM manager.

BIM 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

For more than 10 years, the Department of Justice (DOJ) has used multiple award task order contracts to provide software development and other IT services to its components and other Federal agencies. Using a computer-based decision support system, NIH was able to conduct interactive vendor electronic conferences to review draft RFPs.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” This includes property such as microscopes, chemical reagents, and software. ” For more information, please visit this link. Additionally, the company must demonstrate that it can service the debt.

Income 108