Remove Drafting Remove Maine Remove Materials Remove Subcontracting
article thumbnail

Top OSHA Violations in Construction (2021)

Levelset

When it comes to construction, OSHA has two main groups of rules – called standards – that contractors must follow: Standard 1910 : Occupational Safety and Health Standards Standard 1926 : Safety and Health Regulations for Construction. Well-run construction outfits always have a safety department or a director of safety.”. Peter Lindborg.

OSHA 52
article thumbnail

40 Under 40: Champions of Construction 2023

Autodesk Construction Cloud

He has worked off his own initiative and developed business training material to help guide users. Krystal has been the driving force at Kraus Anderson from the project coordination standpoint, having developed the standards and training materials for ADSK Build, ACC Autospec, and Pype tools.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Material Testing Information.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Material Testing Information.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Sales and Use Tax Exemptions: Alabama also has statutory exemptions from sales and use tax: Raw materials used by manufacturers or compounders. The refund is eligible for taxes paid on construction materials, and machinery and equipment associated with the approved project. Pollution control equipment.

Income 108