Remove Drawings Remove Engineering Remove Lien Remove Subcontracting
article thumbnail

constructionattorneyblog: Subcontractor's Mechanics lien allowed.

Construction Lawyer

He is a partner in the law firm of Sabo & Zahn, concentrating in construction law and representing owners, contractors, architects, developers, engineers and other parties in the construction process. Subcontractors Mechanics lien allowed where bank seized generals funds. May 21, 2009 in litigation , mechanics liens | Permalink.

Lien 40
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. The Technical team (Facilities Management / Engineering) develops specifications and plans necessary for the procurement and implementation of the JOC. Subcontracts. Facilities Management / Engineering contacts the Contractor.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). To qualify, a taxpayer’s research must be conducted within California and include basic or applied research of scientific inquiry, original investigation for the advancement of scientific or engineering knowledge or improved function of a business component.

Income 75